New toy at Canleys!
10 lorry loads of hardcore/soil removed and counting. The level of the car park has dropped by at least 2 foot in the middle which means we can't get anything in and out of the workshop at the moment. The guys are coming along early next week to put the new drains in and after that its full steam ahead with laying the concrete, can't wait!


0 Comments:
Post a Comment
Subscribe to Post Comments [Atom]
<< Home